{"id":116322,"date":"2025-07-08T13:07:53","date_gmt":"2025-07-08T10:07:53","guid":{"rendered":"https:\/\/www.giurgiuveanul.ro\/stiri\/?p=116322"},"modified":"2025-07-08T13:15:01","modified_gmt":"2025-07-08T10:15:01","slug":"modernizare-majora-in-portul-giurgiu-sapte-noi-dane-de-acostare-si-infrastructura-portuara-moderna","status":"publish","type":"post","link":"https:\/\/www.giurgiuveanul.ro\/stiri\/modernizare-majora-in-portul-giurgiu-sapte-noi-dane-de-acostare-si-infrastructura-portuara-moderna\/","title":{"rendered":"Modernizare major\u0103 \u00een Portul Giurgiu: \u0219apte noi dane de acostare \u0219i infrastructur\u0103 portuar\u0103 modern\u0103"},"content":{"rendered":"<p><a href=\"https:\/\/www.giurgiuveanul.ro\/stiri\/wp-content\/uploads\/2025\/07\/00-porr-2.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-116323\" src=\"https:\/\/www.giurgiuveanul.ro\/stiri\/wp-content\/uploads\/2025\/07\/00-porr-2-560x373.jpg\" alt=\"\" width=\"746\" height=\"497\" srcset=\"https:\/\/www.giurgiuveanul.ro\/stiri\/wp-content\/uploads\/2025\/07\/00-porr-2-560x373.jpg 560w, https:\/\/www.giurgiuveanul.ro\/stiri\/wp-content\/uploads\/2025\/07\/00-porr-2-250x167.jpg 250w, https:\/\/www.giurgiuveanul.ro\/stiri\/wp-content\/uploads\/2025\/07\/00-porr-2-768x512.jpg 768w, https:\/\/www.giurgiuveanul.ro\/stiri\/wp-content\/uploads\/2025\/07\/00-porr-2-1536x1023.jpg 1536w, https:\/\/www.giurgiuveanul.ro\/stiri\/wp-content\/uploads\/2025\/07\/00-porr-2-400x266.jpg 400w, https:\/\/www.giurgiuveanul.ro\/stiri\/wp-content\/uploads\/2025\/07\/00-porr-2.jpg 2048w\" sizes=\"auto, (max-width: 746px) 100vw, 746px\" \/><\/a>Ast\u0103zi a avut loc<!--more--> recep\u021bia lucr\u0103rilor de modernizare din Portul Giurgiu, un proiect important pentru dezvoltarea infrastructurii fluviale. La eveniment au participat oficialit\u0103\u021bi centrale \u0219i locale, printre care <strong>Sorin Grindeanu<\/strong> \u2013 fost ministru al Transporturilor \u0219i pre\u0219edinte PSD, <strong>Bogdan M\u00e2ndrescu<\/strong> \u2013 secretar de stat \u00een Ministerul Transporturilor, <strong>Toma Petcu<\/strong> \u2013 pre\u0219edintele Consiliului Jude\u021bean, <strong>Ion Ghimpe\u021beanu<\/strong> \u2013 prefectul jude\u021bului, <strong>deputa\u021bii Marian Mina \u0219i Andrei Alexandru<\/strong>, precum \u0219i <strong>Marian M\u0103roiu<\/strong> \u2013 director APDF, <strong>al\u0103turi de reprezentan\u021bii companiei PORR<\/strong>, care a executat lucr\u0103rile.<\/p>\n<p><a href=\"https:\/\/www.giurgiuveanul.ro\/stiri\/wp-content\/uploads\/2025\/07\/00-porr-4.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-116324\" src=\"https:\/\/www.giurgiuveanul.ro\/stiri\/wp-content\/uploads\/2025\/07\/00-porr-4-560x366.jpg\" alt=\"\" width=\"727\" height=\"475\" srcset=\"https:\/\/www.giurgiuveanul.ro\/stiri\/wp-content\/uploads\/2025\/07\/00-porr-4-560x366.jpg 560w, https:\/\/www.giurgiuveanul.ro\/stiri\/wp-content\/uploads\/2025\/07\/00-porr-4-250x163.jpg 250w, https:\/\/www.giurgiuveanul.ro\/stiri\/wp-content\/uploads\/2025\/07\/00-porr-4-768x501.jpg 768w, https:\/\/www.giurgiuveanul.ro\/stiri\/wp-content\/uploads\/2025\/07\/00-porr-4-1536x1003.jpg 1536w, https:\/\/www.giurgiuveanul.ro\/stiri\/wp-content\/uploads\/2025\/07\/00-porr-4-400x261.jpg 400w, https:\/\/www.giurgiuveanul.ro\/stiri\/wp-content\/uploads\/2025\/07\/00-porr-4.jpg 2048w\" sizes=\"auto, (max-width: 727px) 100vw, 727px\" \/><\/a> <a href=\"https:\/\/www.giurgiuveanul.ro\/stiri\/wp-content\/uploads\/2025\/07\/00-porr-5.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-116325\" src=\"https:\/\/www.giurgiuveanul.ro\/stiri\/wp-content\/uploads\/2025\/07\/00-porr-5-560x391.jpg\" alt=\"\" width=\"726\" height=\"507\" srcset=\"https:\/\/www.giurgiuveanul.ro\/stiri\/wp-content\/uploads\/2025\/07\/00-porr-5-560x391.jpg 560w, https:\/\/www.giurgiuveanul.ro\/stiri\/wp-content\/uploads\/2025\/07\/00-porr-5-250x175.jpg 250w, https:\/\/www.giurgiuveanul.ro\/stiri\/wp-content\/uploads\/2025\/07\/00-porr-5-768x536.jpg 768w, https:\/\/www.giurgiuveanul.ro\/stiri\/wp-content\/uploads\/2025\/07\/00-porr-5-1536x1073.jpg 1536w, https:\/\/www.giurgiuveanul.ro\/stiri\/wp-content\/uploads\/2025\/07\/00-porr-5-400x279.jpg 400w, https:\/\/www.giurgiuveanul.ro\/stiri\/wp-content\/uploads\/2025\/07\/00-porr-5.jpg 2048w\" sizes=\"auto, (max-width: 726px) 100vw, 726px\" \/><\/a><\/p>\n<p>Portul Giurgiu continu\u0103 procesul amplu de modernizare a infrastructurii, prin realizarea unui set extins de lucr\u0103ri care consolideaz\u0103 capacitatea opera\u021bional\u0103 \u0219i siguran\u021ba naviga\u021biei \u00een zon\u0103. Recent, compania PORR a finalizat construc\u021bia a \u0219apte noi dane de acostare, \u00eensum\u00e2nd o lungime total\u0103 de 860 de metri, precum \u0219i alte facilit\u0103\u021bi portuare moderne.<\/p>\n<p><a href=\"https:\/\/www.giurgiuveanul.ro\/stiri\/wp-content\/uploads\/2025\/07\/00-porr-3.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-116326\" src=\"https:\/\/www.giurgiuveanul.ro\/stiri\/wp-content\/uploads\/2025\/07\/00-porr-3-560x356.jpg\" alt=\"\" width=\"716\" height=\"455\" srcset=\"https:\/\/www.giurgiuveanul.ro\/stiri\/wp-content\/uploads\/2025\/07\/00-porr-3-560x356.jpg 560w, https:\/\/www.giurgiuveanul.ro\/stiri\/wp-content\/uploads\/2025\/07\/00-porr-3-250x159.jpg 250w, https:\/\/www.giurgiuveanul.ro\/stiri\/wp-content\/uploads\/2025\/07\/00-porr-3-768x488.jpg 768w, https:\/\/www.giurgiuveanul.ro\/stiri\/wp-content\/uploads\/2025\/07\/00-porr-3-1536x977.jpg 1536w, https:\/\/www.giurgiuveanul.ro\/stiri\/wp-content\/uploads\/2025\/07\/00-porr-3-400x254.jpg 400w, https:\/\/www.giurgiuveanul.ro\/stiri\/wp-content\/uploads\/2025\/07\/00-porr-3.jpg 2048w\" sizes=\"auto, (max-width: 716px) 100vw, 716px\" \/><\/a><\/p>\n<p style=\"text-align: justify;\"><strong>\u00cen zona portului Ramadan<\/strong>, au fost realizate <strong>trei dane noi la Dun\u0103re<\/strong>, \u00een solu\u021bie de cheu vertical, cu o platform\u0103 portuar\u0103 de 10.000 mp, teren c\u00e2\u0219tigat asupra apei, echipate cu cale de rulare pentru macarale de cheu, <strong>\u015fi dou\u0103 dane suplimentare<\/strong>, \u00een solu\u021bie de cheu pereat, realizate cu dale prefabricate din beton.<\/p>\n<p style=\"text-align: justify;\">Totodat\u0103, <strong>\u00een zona bazinului Veriga<\/strong>, au fost amenajate dou\u0103 dane noi, tot \u00een solu\u021bie de cheu vertical, cu o platform\u0103 portuar\u0103 de 5.000 mp, ob\u021binut\u0103 prin extinderea \u00een luciul de ap\u0103.<\/p>\n<p style=\"text-align: justify;\">Pe l\u00e2ng\u0103 aceste investi\u021bii \u00een dane de acostare, proiectul a inclus \u0219i:<\/p>\n<ul>\n<li style=\"text-align: justify;\"><span style=\"color: #000000;\"><strong>Construirea unei rampe de lansare la ap\u0103 destinat\u0103 ambarca\u021biunilor de agreement<\/strong><\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"color: #000000;\"><strong>Amenajarea gurii de intrare \u00een bazinul Veriga, o interven\u021bie menit\u0103 s\u0103 sporeasc\u0103 siguran\u021ba naviga\u021biei \u0219i s\u0103 optimizeze fluxurile opera\u021bionale \u00een zon\u0103<\/strong><\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"color: #000000;\"><strong>Introducerea unor re\u021bele de utilit\u0103\u021bi moderne, precum energie electric\u0103, ap\u0103 la cheu \u0219i iluminat public portuar, esen\u021biale pentru o exploatare eficient\u0103 \u0219i sigur\u0103 a noilor facilit\u0103\u021bi<\/strong><\/span><\/li>\n<\/ul>\n<p><a href=\"https:\/\/www.giurgiuveanul.ro\/stiri\/wp-content\/uploads\/2025\/07\/00-porr-1.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-116327\" src=\"https:\/\/www.giurgiuveanul.ro\/stiri\/wp-content\/uploads\/2025\/07\/00-porr-1-560x386.jpg\" alt=\"\" width=\"714\" height=\"492\" srcset=\"https:\/\/www.giurgiuveanul.ro\/stiri\/wp-content\/uploads\/2025\/07\/00-porr-1-560x386.jpg 560w, https:\/\/www.giurgiuveanul.ro\/stiri\/wp-content\/uploads\/2025\/07\/00-porr-1-250x172.jpg 250w, https:\/\/www.giurgiuveanul.ro\/stiri\/wp-content\/uploads\/2025\/07\/00-porr-1-768x530.jpg 768w, https:\/\/www.giurgiuveanul.ro\/stiri\/wp-content\/uploads\/2025\/07\/00-porr-1-1536x1060.jpg 1536w, https:\/\/www.giurgiuveanul.ro\/stiri\/wp-content\/uploads\/2025\/07\/00-porr-1-400x276.jpg 400w, https:\/\/www.giurgiuveanul.ro\/stiri\/wp-content\/uploads\/2025\/07\/00-porr-1.jpg 2048w\" sizes=\"auto, (max-width: 714px) 100vw, 714px\" \/><\/a><\/p>\n<p style=\"text-align: justify;\"><em>\u201eNe afl\u0103m \u00een fa\u021ba unui pas important pentru dezvoltarea infrastructurii portuare a municipiului Giurgiu. Noile dane \u0219i dot\u0103rile moderne vin \u00een sprijinul unei activit\u0103\u021bi portuare eficiente \u0219i sustenabile, cu impact direct asupra economiei locale \u0219i a siguran\u021bei naviga\u021biei. Este un proiect amplu, care reflect\u0103 angajamentul nostru pentru modernizare \u0219i performan\u021b\u0103 \u00een sectorul transportului naval\u201d,<\/em> a declarat <strong>Marius Pencea<\/strong>, <strong><em>reprezentant al companiei PORR<\/em><\/strong>.<\/p>\n<p style=\"text-align: justify;\">Noile facilit\u0103\u021bi portuare sunt menite s\u0103 sus\u021bin\u0103 at\u00e2t activit\u0103\u021bile comerciale, c\u00e2t \u0219i turismul fluvial, oferind un plus de competitivitate \u0219i atractivitate Portului Giurgiu la nivel regional.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Ast\u0103zi a avut loc<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6],"tags":[],"class_list":["post-116322","post","type-post","status-publish","format-standard","hentry","category-breaking-news"],"_links":{"self":[{"href":"https:\/\/www.giurgiuveanul.ro\/stiri\/wp-json\/wp\/v2\/posts\/116322","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.giurgiuveanul.ro\/stiri\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.giurgiuveanul.ro\/stiri\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.giurgiuveanul.ro\/stiri\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.giurgiuveanul.ro\/stiri\/wp-json\/wp\/v2\/comments?post=116322"}],"version-history":[{"count":3,"href":"https:\/\/www.giurgiuveanul.ro\/stiri\/wp-json\/wp\/v2\/posts\/116322\/revisions"}],"predecessor-version":[{"id":116330,"href":"https:\/\/www.giurgiuveanul.ro\/stiri\/wp-json\/wp\/v2\/posts\/116322\/revisions\/116330"}],"wp:attachment":[{"href":"https:\/\/www.giurgiuveanul.ro\/stiri\/wp-json\/wp\/v2\/media?parent=116322"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.giurgiuveanul.ro\/stiri\/wp-json\/wp\/v2\/categories?post=116322"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.giurgiuveanul.ro\/stiri\/wp-json\/wp\/v2\/tags?post=116322"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}