{"id":84175,"date":"2021-10-29T19:54:54","date_gmt":"2021-10-29T16:54:54","guid":{"rendered":"https:\/\/www.giurgiuveanul.ro\/stiri\/?p=84175"},"modified":"2021-10-29T19:55:42","modified_gmt":"2021-10-29T16:55:42","slug":"presedintele-consiliului-judetean-giurgiu-dumitru-beianu-a-verificat-stadiul-lucrarilor-de-reabilitare-a-drumului-judetean-412-a","status":"publish","type":"post","link":"https:\/\/www.giurgiuveanul.ro\/stiri\/presedintele-consiliului-judetean-giurgiu-dumitru-beianu-a-verificat-stadiul-lucrarilor-de-reabilitare-a-drumului-judetean-412-a\/","title":{"rendered":"Pre\u0219edintele Consiliului Jude\u021bean Giurgiu, Dumitru Beianu, a verificat stadiul lucr\u0103rilor de reabilitare a Drumului Jude\u021bean 412 A"},"content":{"rendered":"<p style=\"text-align: justify;\"><strong><a href=\"https:\/\/www.giurgiuveanul.ro\/stiri\/wp-content\/uploads\/2021\/10\/249937011_275744794465531_5059198882110103144_n.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-84176\" src=\"https:\/\/www.giurgiuveanul.ro\/stiri\/wp-content\/uploads\/2021\/10\/249937011_275744794465531_5059198882110103144_n-560x420.jpg\" alt=\"\" width=\"579\" height=\"434\" srcset=\"https:\/\/www.giurgiuveanul.ro\/stiri\/wp-content\/uploads\/2021\/10\/249937011_275744794465531_5059198882110103144_n-560x420.jpg 560w, https:\/\/www.giurgiuveanul.ro\/stiri\/wp-content\/uploads\/2021\/10\/249937011_275744794465531_5059198882110103144_n-250x188.jpg 250w, https:\/\/www.giurgiuveanul.ro\/stiri\/wp-content\/uploads\/2021\/10\/249937011_275744794465531_5059198882110103144_n-768x576.jpg 768w, https:\/\/www.giurgiuveanul.ro\/stiri\/wp-content\/uploads\/2021\/10\/249937011_275744794465531_5059198882110103144_n-400x300.jpg 400w, https:\/\/www.giurgiuveanul.ro\/stiri\/wp-content\/uploads\/2021\/10\/249937011_275744794465531_5059198882110103144_n.jpg 960w\" sizes=\"auto, (max-width: 579px) 100vw, 579px\" \/><\/a>Pre\u0219edintele Consiliului Jude\u021bean Giurgiu, Dumitru Beianu,<!--more--> a verificat, recent, stadiul lucr\u0103rilor de reabilitare a Drumului Jude\u021bean 412 A Aduna\u021bii Cop\u0103ceni &#8211; D\u0103r\u0103\u0219ti Vla\u0219ca &#8211; Novaci &#8211; Pope\u0219ti &#8211; Mih\u0103ile\u0219ti.<\/strong><\/p>\n<p style=\"text-align: justify;\">Primul strat de asfalt a fost deja turnat pe acest sector de drum, urm\u00e2nd ca \u00een perioada urm\u0103toare s\u0103 fie turnat \u0219i al doilea strat \u0219i, de asemenea, s\u0103 se execute \u0219i lucr\u0103rile adiacente: scurgeri, c\u0103i de acces c\u0103tre gospod\u0103rii.<\/p>\n<p><a href=\"https:\/\/www.giurgiuveanul.ro\/stiri\/wp-content\/uploads\/2021\/10\/249792088_275744867798857_2050287948161564090_n.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter  wp-image-84179\" src=\"https:\/\/www.giurgiuveanul.ro\/stiri\/wp-content\/uploads\/2021\/10\/249792088_275744867798857_2050287948161564090_n-560x420.jpg\" alt=\"\" width=\"584\" height=\"438\" srcset=\"https:\/\/www.giurgiuveanul.ro\/stiri\/wp-content\/uploads\/2021\/10\/249792088_275744867798857_2050287948161564090_n-560x420.jpg 560w, https:\/\/www.giurgiuveanul.ro\/stiri\/wp-content\/uploads\/2021\/10\/249792088_275744867798857_2050287948161564090_n-250x188.jpg 250w, https:\/\/www.giurgiuveanul.ro\/stiri\/wp-content\/uploads\/2021\/10\/249792088_275744867798857_2050287948161564090_n-768x576.jpg 768w, https:\/\/www.giurgiuveanul.ro\/stiri\/wp-content\/uploads\/2021\/10\/249792088_275744867798857_2050287948161564090_n-400x300.jpg 400w, https:\/\/www.giurgiuveanul.ro\/stiri\/wp-content\/uploads\/2021\/10\/249792088_275744867798857_2050287948161564090_n.jpg 960w\" sizes=\"auto, (max-width: 584px) 100vw, 584px\" \/><\/a> <a href=\"https:\/\/www.giurgiuveanul.ro\/stiri\/wp-content\/uploads\/2021\/10\/249875410_275744787798865_32790236578995436_n.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter  wp-image-84180\" src=\"https:\/\/www.giurgiuveanul.ro\/stiri\/wp-content\/uploads\/2021\/10\/249875410_275744787798865_32790236578995436_n-560x420.jpg\" alt=\"\" width=\"583\" height=\"437\" srcset=\"https:\/\/www.giurgiuveanul.ro\/stiri\/wp-content\/uploads\/2021\/10\/249875410_275744787798865_32790236578995436_n-560x420.jpg 560w, https:\/\/www.giurgiuveanul.ro\/stiri\/wp-content\/uploads\/2021\/10\/249875410_275744787798865_32790236578995436_n-250x188.jpg 250w, https:\/\/www.giurgiuveanul.ro\/stiri\/wp-content\/uploads\/2021\/10\/249875410_275744787798865_32790236578995436_n-768x576.jpg 768w, https:\/\/www.giurgiuveanul.ro\/stiri\/wp-content\/uploads\/2021\/10\/249875410_275744787798865_32790236578995436_n-400x300.jpg 400w, https:\/\/www.giurgiuveanul.ro\/stiri\/wp-content\/uploads\/2021\/10\/249875410_275744787798865_32790236578995436_n.jpg 960w\" sizes=\"auto, (max-width: 583px) 100vw, 583px\" \/><\/a><\/p>\n<p style=\"text-align: justify;\">Sectorul de drum care face obiectul proiectului este \u00een lungime total\u0103, 12,53340 km, \u00een administrarea Consiliului Jude\u021bean Giurgiu. 12,20426 km sunt situa\u021bi \u00een zona eligibil\u0103 transfrontalier\u0103, iar 0,335 km \u00een afara ariei eligibile a programului, dup\u0103 cum urmeaz\u0103:<\/p>\n<p style=\"text-align: justify;\">Proiectul este cofinan\u021bat de Uniunea European\u0103 prin Fondul European pentru Dezvoltare Regional\u0103 \u00een cadrul Programului Interreg V-A Rom\u00e2nia &#8211; Bulgaria 2014 &#8211; 2020, Axa Prioritar\u0103 1 \u201eO regiune bine conectat\u0103\u201d.<\/p>\n<p style=\"text-align: justify;\">Valoarea proiect\u0103rii \u0219i execu\u021biei lucr\u0103rii este de 24.005.369,10 lei, 23.521.291,75\u00a0 lei reprezent\u00e2nd fonduri nerambursabile.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Pre\u0219edintele Consiliului Jude\u021bean Giurgiu, Dumitru Beianu,<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6],"tags":[],"class_list":["post-84175","post","type-post","status-publish","format-standard","hentry","category-breaking-news"],"_links":{"self":[{"href":"https:\/\/www.giurgiuveanul.ro\/stiri\/wp-json\/wp\/v2\/posts\/84175","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.giurgiuveanul.ro\/stiri\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.giurgiuveanul.ro\/stiri\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.giurgiuveanul.ro\/stiri\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.giurgiuveanul.ro\/stiri\/wp-json\/wp\/v2\/comments?post=84175"}],"version-history":[{"count":0,"href":"https:\/\/www.giurgiuveanul.ro\/stiri\/wp-json\/wp\/v2\/posts\/84175\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.giurgiuveanul.ro\/stiri\/wp-json\/wp\/v2\/media?parent=84175"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.giurgiuveanul.ro\/stiri\/wp-json\/wp\/v2\/categories?post=84175"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.giurgiuveanul.ro\/stiri\/wp-json\/wp\/v2\/tags?post=84175"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}